Short answer
A structural engineer first, then a builder or a specialist underpinning or restumping contractor working to the engineer's design. Do not accept a quote from anyone who has not seen a level survey — 'we can underpin that' without measurement is a sales position rather than a diagnosis.
When it is someone else
Calling the wrong trade costs an attendance fee to be told so. These are the cases where this problem belongs to someone other than a Builder.
a structural engineer
always, and first. The engineer specifies what is needed; the contractor executes it. Reversing that order is how people buy more underpinning than the house required.
a drain or water service leak is suspected as the cause. Fixing the house without fixing the water is temporary.
What to do before anyone arrives
- Get a floor level survey. It is a straightforward measurement and it turns opinions into millimetres.
- Collect your crack monitoring — dated photographs over months are worth a great deal here.
- Check whether your insurance covers any part of it. Many policies exclude gradual movement and cover damage from a specific escape of water, which is exactly why the cause matters.
- Find the site drainage: downpipes, surface falls, the garden beds against the wall.
What to ask when you book
- Whose engineering design are you building to, and can I see it?
- Is this underpinning, restumping or reblocking, and why is that the right answer for this construction?
- How is the work sequenced and how long is the house occupied during it?
- What contract and warranty insurance applies at this value in this state?
What changes the price
No dollar figures here: this directory holds no price data and an invented range is worse than none. What follows is what makes one of these jobs cost more than the same job next door, which is the part you can actually use when comparing quotes.
- Number and depth of piers or stumps.
- Access — a house with a crawl space is very different from one on a slab.
- Whether the movement is still active, which changes the engineering.
- Making good: cracks, doors, windows and floors after the structure is corrected.
Is this licensed work?
Structural building work, licensed in every state, generally requiring a written contract and statutory warranty insurance above a threshold. The engineering design is a registered professional's work.
There is no national register. Search the licence number with the regulator for the state the work is happening in.
- NSWNSW Fair Tradingbuilders, electricians, plumbers and specialist trades
- VICBuilding and Plumbing Commission, and Energy Safe Victoria for electricalbuilding practitioners and plumbers; electricians are Energy Safe Victoria
- QLDQueensland Building and Construction Commission (QBCC)building and most trade contractor licences
- WABuilding and Energybuilders, electricians, plumbers and gas fitters
- SAConsumer and Business Servicesbuilding work contractors and supervisors
- TASConsumer, Building and Occupational Services (CBOS)building and occupational licences
- ACTAccess Canberraconstruction occupations licensing
- NTNT Government building practitioner registrationbuilding practitioners and electrical workers
Licensing thresholds and certificate requirements differ by state and change with amending regulation, so this page describes the mechanism rather than quoting a figure. The regulator’s own page is the current answer.
Common questions
- Who should I hire for a house that needs underpinning
- A structural engineer first, then a builder or a specialist underpinning or restumping contractor working to the engineer's design. Do not accept a quote from anyone who has not seen a level survey — 'we can underpin that' without measurement is a sales position rather than a diagnosis.
- What is the difference between underpinning and restumping?
- Restumping — also called reblocking — replaces the stumps a timber-framed house sits on and applies to houses with a subfloor. Underpinning extends and strengthens existing footings, usually on a slab or strip-footed house, by taking the load down to more stable ground. They solve similar symptoms on completely different construction, which is why a contractor should be naming your construction type before naming a method.
- Should I fix the cracks first?
- No. Repairing the cosmetic damage before the movement is stopped guarantees doing it twice, and it also destroys the record of how far things have moved. Fix the cause, allow the house to settle, then make good.
Find a Builder near you
9,049 builders in this directory, ranked on published evidence rather than on advertising.
Who to hire for
- Who to hire for cracks in the wallsFor hairline cracks in plaster, a plasterer or a painter. For cracks that are wider than a few millimetres, st…
- Who to hire for a floor that feels bouncyA builder or a carpenter who does subfloor work — and if the house is on stumps, a restumping contractor. The …
- Who to hire for damp at the bottom of a wallA builder or a damp specialist — but insist on a diagnosis before a treatment. Damp at the base of a wall has …
- Who to hire for water damage to a ceilingFind and fix the source first — roofer, plumber or air conditioning technician depending on the cause — and on…
General information about who does what, not advice about your specific job. Licensing, consumer law and council rules differ by state and change; the regulator for your state is the current source. More guides to hiring a tradesperson.